KOYULHİSAR HEPP PROJECT
KOYULHİSAR HEPP PROJECT

KOYULHİSAR HES PROJESİ

BEREKET ENERGY
BUILD-OPERATE-TRANSFER
Sivas

63 MW Power Plant

MIDİLLİ HEPP PROJECT

Employer:
Main Contractor :
Project Location:
Project Description:

 

 

 

 

Characteristics of the Project:

HABBUSH GROUP
TCT Construction. Mad. Industry. Trade Ltd. Co.

Amasya

32 MW Power Plant

Installed Power: 3 x 34.24 MWm = 102.72 MWm
Average Production: 416.00 GWh/year
Project Flow: 105.00 m3/s


Characteristics of Transmission Channels
Trapezoidal Channel Type: 2 090.00 meters
Vertical Channel Type: 16 465.30 meters
Tunnel: 5 043.70 meters


Tunnel Characteristics
Tunnel Type: Circular, Free Surface
Tunnel Diameter: 6.00 meters
Total Tunnel Length: 5 043.70 meters
Net Head: 106.24 meters
Penstock Pipe Diameter: 3 x 3 000 mm
Regulator Type:
6 x Radial Gate, Concrete Weighted Powerhouse
Hydraulic Turbines: 3 x Vertical Axis Francis
Powerhouse Generators: 3 x Vertical Axis
Synchronous

MIDDILLI HEPP PROJECT
MIDDILLI HEPP PROJECT
MIDDILLI HEPP PROJECT
dida-en-behyaz.png

Onur Mah. Turhan Cemal Beriker Blvd. Kiza Business Center A2 Block Floor: 1 No: 12 Seyhan/Adana

2025 DİDA ROAD CONSTRUCTION | ALL RIGHTS RESERVED. WEB: GRAPHIC DESIGN

Yol güven veriyorsa, ardında Dida vardır.

Otoyol Vektör Sanatı
bottom of page